St Leondards, VIC

Beach renourishment works at St Leondards is part of a series of beach renourishments on the northern Bellarine Peninsula, with almost 30,000 cubic metres of sand having been distributed across four beaches at Indented Head and St Leonards over the last two years. By increasing the width of the beach along a 200-metre stretch, the works provide protection for infrastructure behind the foreshore, including the low-lying coastal trail.

Project details

Beach renourishment

Method: Pumped from offshore (800m)

Sand source: Same sediment compartment

Sand volume (m2): 35000

Sand placement: Erroded area

General information

Approach

Beach renourishment

Geographic context

Open coast

Organisation responsible

DELWP and the Bellarine Bayside Committee of Management

Primary objective

Coastal protection

Coastal hazard

Erosion, Storms

Asset vulnerable

Recreational, Built

Length of coastline targeted (m)

200

Date of completion

2022

Source of project funding

DELWP